Home › Mandaue City
Solar Panel Installation in Mandaue City
SolarConcept Cebu installs solar across every Mandaue City barangay. One important note for Mandaue residents: you are served by MECO (Mandaue Electric Company), not VECO — and we handle the full MECO net metering paperwork for free as part of your installation.
Areas we cover in Mandaue City
We install across all 27 Mandaue barangays:
- Alang-alang
- Bakilid
- Banilad
- Cabancalan
- Cambaro
- Casili
- Casuntingan
- Centro
- Cubacub
- Guizo
- Ibabao-Estancia
- Jagobiao
- Labogon
- Looc
- Maguikay
- Mantuyong
- Opao
- Pakna-an
- Pagsabungan
- Subangdaku
- Tabok
- Tingub
- Tipolo
- Umapad
MECO net metering in Mandaue
Mandaue residents apply for net metering through MECO instead of VECO. The process is similar — application, inspection, bi-directional meter swap, first credited bill — but the utility is different. SolarConcept Cebu is registered with both VECO and MECO and submits MECO applications on your behalf. See our VECO net metering guide (process is parallel for MECO).
With Cebu's 5-6 peak sun hours per day and MECO residential rates above PHP 11/kWh, most Mandaue households see 4-6 year payback on a grid-tied system.
Mandaue solar pricing
Pricing matches our Metro Cebu cost guide:
- 2-3 kW system: PHP 120,000-150,000
- 5-6 kW system: PHP 235,000-295,000 (most installed)
- 6-8 kW system: PHP 295,000-600,000
- 12-16 kW system: PHP 650,000-980,000
Book a free site survey in Mandaue
About SolarConcept Cebu: 30+ installs across Metro Cebu including Mandaue since March 2022. MECO and VECO registered. About our team →